Severity: Warning
Message: is_readable(): open_basedir restriction in effect. File(/dev/urandom) is not within the allowed path(s): (/var/www/vhosts/worldmixture.com/:/tmp/)
Filename: core/Security.php
Line Number: 584
Delhi-Alwar Corridor: The 106-km-long Delhi -Gurugram-SNB corridor will be elevated for about 71 km (11 stations), the remaining 35 km (5 stations) will be constructed underground, mostly in Delhi & Gurugram.